Multi-Functional Solar Power for Mainers

Get ahead of the busy season and own your electricity bill by winter.

We install Maine Solar Sheds throughout the year, but spring is when we line up our first round of projects before the busy season fills up. Grabbing one of the slots locks in pricing and delivery times, so you don't miss a kW of sun. 

You'll benefit from:

Preferred pricing, smoother delivery timelines, priority build, and complete installation before the end of summer.

Cost of waiting

At current electricity rates, the average Maine property spends over $3,300 per year on power that a properly sized solar system could offset. Waiting another year isn’t neutral; it’s another year of paying into rising utility costs.

Our Spring Build Window isn’t a promotion or gimmick. It’s based on how many projects we can realistically schedule before peak demand.

Once those slots are filled, timelines extend to later in the season.

1Terms and conditions

  • To qualify, all projects must be under contract and have received a deposit by 4 pm on 5/30/2026. There are no exceptions. The project deposit is 1/3 of the Upright Energy contract amount and 10% of the Backyard Buildings Shed order value.
  • Once projects are contracted, the equipment is ordered, and then the second third of the Upright Energy contract amount is due.
  • Substantial Completion of all Maine Solar Sheds is when they are completed and deliverable. At this time, the final payment to Upright Energy for the solar installation and the building is due. All completed Maine Solar Sheds will be stored at Backyard Buildings until they can be delivered.
  • Project installations are prioritized by order of contract completion date.
  • Pricing is based on current 2026 pricing and costs.
  • Promotion ends May 30, 2026, at 4 p.m.

Discount exclusions: 

  • Delivery: pricing is variable based on delivery location.
  • Groundwork construction, pad building, trenching, etc.
  • Electrical Installation on site.
  • Previously provided quotes.